Appendix E: 30/60/90 Day Adoption Roadmap
Two tracks: one for an individual engineer, one for a team of ten to fifty. Each phase ends with a gate, a short test of whether to move on.
Individual track
Days 1 to 7: Foundations
- Install, configure permissions, finish the first-day checklist (Chapter 2)
- Write and refine
CLAUDE.mdfor your main repository (Chapter 4) - Use plan mode on every non-trivial task
- Practice rewind instead of correction (Chapter 3)
Gate: you can complete a small feature using spec, plan, implement, verify without retyping project context.
Days 8 to 30: Habits
- Create three skills from your most repeated prompts (Chapter 5)
- Add a formatter hook and a test-on-stop hook (Appendix C)
- Create a code-reviewer subagent and use it on every change
- Run
/security-reviewbefore every push - Keep a plan file for any task longer than a day
Gate: most of your changes pass review without requests for basic fixes.
Days 31 to 60: Extension
- Connect your issue tracker and one other system through MCP (Chapter 7)
- Install one plugin and read all of its code first
- Run two parallel sessions with worktrees (Chapter 12)
- Script one batch task with
claude -p
Gate: you can take a ticket ID to an open PR with tests in one supervised session.
Days 61 to 90: Mastery and contribution
- Package your best skills, hooks, and subagent as a team plugin
- Run the writer and reviewer pattern on a large feature
- Present one win and one failure at the team review
- Mentor one teammate through their first two weeks
Gate: something you built is in daily use by people other than you.
Team track
Weeks 1 to 4: Pilot
- Pick two or three volunteer engineers and one non-critical repository
- Record baselines: lead time, change failure rate, review time (Chapter 13)
- Agree on data handling rules with security and legal
- Pilot engineers keep a short log of what worked and what broke
Gate: pilot engineers report clear time savings and no quality regressions.
Warning signs: pilot engineers have stopped using it, or a bug traced to unreviewed AI output reached production.
Weeks 5 to 8: Structure
- Commit team
CLAUDE.md,.claude/settings.json, and shared hooks to pilot repos - Name a champion per team with protected time (Chapter 14)
- Stand up an internal plugin marketplace with the first shared skills
- Add the security review Action and
CODEOWNERSfor high-risk paths - Start the weekly fifteen-minute review
Gate: a new engineer can set up and complete a task using only the team's shared configuration.
Warning signs: each engineer maintains a private setup; shared skills go unused.
Weeks 9 to 12: Rollout and governance
- Expand to all teams, champions first
- Enforce organization-wide managed settings: deny rules, approved MCP servers
- Publish the engineering policy: ownership, mandatory review paths, data rules
- Add Claude Code to onboarding (the five-day plan in Chapter 14)
- Compare metrics against the baseline and share results openly
Gate: lead time improves and change failure rate holds steady or improves.
Warning signs: lead time improves while change failure rate rises. Thicken the verification stack before expanding further.
Metrics dashboard
| Metric | Source | Direction you want |
|---|---|---|
| Lead time, commit to production | Deploy pipeline | Down |
| Change failure rate | Incident tracker | Flat or down |
| Escaped defects per release | Bug tracker | Flat or down |
| Security findings, High and Critical | Scanners and reviews | Down |
| Median PR review time | Git host | Down |
| PR size, lines changed | Git host | Flat or down |
| Engineer-reported toil hours | Quarterly survey | Down |